Field guides for shoring and foundations.

Understand the support behind deep basements, excavations beside existing buildings, and hillside construction through practical explanations and documented projects.

Engineering explained

How the support works and where it fits.

A retaining wall, temporary shoring, and an underpinning system do different jobs. Learn how they work, when they are needed, and how they fit together on a construction site.

Local planning guides

Excavation and foundation work in California, Texas, and Utah.

Explore underground parking, hillside construction, hospital expansions, and other projects where nearby buildings, utilities, groundwater, or local review requirements affect the design.

California

Steel rakers supporting a shoring wall at BLVD 6200

Los Angeles, California / 6 min read /

Shoring Costs in Los Angeles: What Affects the Price

See how excavation depth, tieback rights, access, utilities, and field changes affect shoring design and construction, with examples from Cefali projects.

Soil nail and retaining wall construction at Glendale Community College

Los Angeles, California / 5 min read /

Retaining Walls and Slope Stabilization in Los Angeles

Retaining walls, hillside stability, and excavation support serve different purposes. See how Cefali designs permanent walls around foundations and property limits.

Conceptual hillside foundation and earth-retention scene

Statewide, California / 4 min read /

DSA Earth Shoring Engineering for California Schools

Cefali designs earth shoring for California public school and college projects that need DSA review. See the excavation support at Glendale Community College.

Texas