Specialty Foundations and Stabilization

Vista Monterey Soil Nails

Cefali designed top-down retaining walls using soil nails where easements were available and soldier piles where property constraints prevented nail installation.

View project photos
Vista Monterey Soil Nails image 1
Vista Monterey Soil Nails
ClientSares Regis Group
MarketSpecialty Foundations and Stabilization
Site location2225 Collett Ave, Corona, CA 92879View map ↗
Engineering workSoil nail walls / Slope stabilization / Earth retention systems

Project record

Project overview

Discuss a similar site

Vista Monterey in Corona was designed by Architects Orange. Sares Regis Group retained Cefali & Associates to design top-down retaining walls for the development.

The retaining system combined soil nails and soldier piles. The tallest soil nail sections reached 25 feet with five rows of nails whose lengths were constrained by the property line.

Soldier pile walls were used on either side of the nail wall where easements for the nails were not permitted. The city required decorative wall faces, so both wall styles received a BoulderScape rock face.

Site conditions and engineering work

What shaped the design.

  • Top-down soil nail retaining walls up to 25 feet high
  • Soldier pile wall transitions where nail easements were unavailable
  • Property-line limits directly affected the retaining system