Corona, California

Retaining wall work in Corona

At Vista Monterey, a top-down retaining wall had to fit both the development excavation and the available property rights.

Cefali & Associates designed soil nail walls where nail easements were available and soldier pile walls where nails could not extend beyond the property line.

Local conditions

Property limits changed the wall system

The tallest soil nail section reached 25 feet and used five rows of nails. Soldier pile walls continued the retention on either side where nail easements were unavailable. Both wall types received decorative rock faces required by the city.

Engineering services

Services for Corona sites

Explore the services used on documented local projects and the broader engineering work available for other site conditions.

Published work

Projects in Corona

Vista Monterey Soil Nails image 1
2225 Collett Ave, Corona, CA 92879

Vista Monterey Soil Nails

Collett Avenue: top-down soil nail walls with soldier pile transitions at property-line constraints.

Project inquiry

Working on a site in Corona?

Tell us the address, excavation or retaining condition, and the plans or reports available so far.

Discuss your project