Corona, California

Soil nail wall engineering in Corona

Discuss your project

Soil nails reinforce ground behind a cut as the wall is built from the top down. At Vista Monterey, the available property rights limited how far nails could extend behind the retaining face.

Cefali & Associates designed soil nail sections where easements allowed them and soldier pile walls where they did not. The development’s tallest soil nail wall reached 25 feet with five rows of nails.

Site conditions

Wall design at the property line

Limited nail length

The property line constrained nail lengths along the tallest section. Five rows supported the 25-foot top-down wall.

Transitions to soldier piles

Where easements for nails were unavailable, soldier pile walls continued the earth retention on either side of the nail section.

Finished wall face

The city required a decorative finish, so both the soil nail and soldier pile wall styles received a BoulderScape rock face.

Published project work

Corona projects behind this service

Vista Monterey Soil Nails image 1
2225 Collett Ave, Corona, CA 92879

Vista Monterey Soil Nails

Top-down soil nails and soldier pile transitions retained the Vista Monterey development excavation.

Engineering scope

From local project to your site

These projects show how excavation depth, neighboring structures, access, and the permanent work can change the support design. Your site needs its own geotechnical criteria and structural design. The contractor determines installation and construction means and methods.

Read more about soil nail walls or explore other published work in Corona.

Project inquiry

Discuss your Corona project.

Send the site address, excavation or retaining plans, and available geotechnical information. We can discuss the engineering scope for the actual condition.

Contact Cefali & Associates