Shoring and excavation support

Earth shoring engineering for Anaheim construction

Discuss your project

A below-grade addition and a cut behind a hillside retaining wall create different support conditions on an Anaheim project. The temporary wall needs to function while foundations, drainage, and permanent concrete are still being built. Cefali & Associates provides shoring engineering for that construction stage.

Our documented work at USC Coliseum in Los Angeles included support around retained seating and tunnels, with entrance stairs carried over the excavation. At Vista Monterey in Corona, property limits changed the retaining system along the site.

Excavation and construction

Changes in grade change the wall along its length

Anaheim Public Works publishes grading and hillside grading submittal resources alongside right-of-way improvement requirements. The project’s actual grades determine where temporary support is needed. A lower wall segment at one end does not establish the demands on a taller segment at the other.

Soldier pile spacing, anchor levels, and transitions between wall types depend on the retained heights, loads, and geotechnical criteria. At Vista Monterey in Corona, soil nail walls changed to soldier piles where nail easements were unavailable. Overall slope stability and structural earth retention remain separate engineering questions.

Anaheim Public Works grading and right-of-way plan review

Excavation and construction

Permanent foundations need room inside temporary support

A raker bears on a foundation inside the excavation. Its footprint can overlap the future footing, slab, or equipment route. A cross-lot brace clears the bottom differently but can obstruct lifting or tall equipment. These are construction consequences of the structural arrangement.

Cefali’s temporary shoring design addresses the support stages and interfaces with the permanent work. Preliminary basement sections and a proposed excavation sequence are useful even before the full building package is complete. Contractor installation planning remains distinct from structural design.

Comparable California projects

Experience with constrained excavation.

These documented projects show the engineering and construction conditions. Each example identifies its actual location.

USC Coliseum image 1
3911 S. Figueroa St., Los Angeles, CA 90037

USC Coliseum

Los Angeles, California: shoring around retained seating and tunnels, including stairs supported over the excavation.

Vista Monterey Soil Nails image 1
2225 Collett Ave, Corona, CA 92879

Vista Monterey Soil Nails

Corona, California: soil nail walls with soldier pile transitions where nail easements were unavailable.

Engineering scope

From a support concept to structural details.

A concept for bidding, detailed drawings and calculations, and engineering for construction-stage changes can be separate assignments. The proposal identifies the services included. Geotechnical assessment, water-control design, property rights, and contractor installation remain distinct responsibilities.

See our shoring engineering services, temporary shoring design, soldier pile walls, tieback shoring, and soil nail walls.

Discuss your project

Show us the excavation you need to support.

Send the project location, preliminary plans, and any geotechnical information you already have. Describe nearby structures, access limits, or what changed during construction. You do not need a complete design package to begin a conversation.

Discuss the shoring scope