Cefali worked with the architect and structural engineer on a permanent wall that relieved earth pressure from the building while temporary retained heights supported drilled-pile foundation excavation.

View project photos
Glendale Community College image 1
Glendale Community College
ClientHMC
MarketEducation
Site location1500 N. Verdugo Rd., Glendale, CA 91208View map ↗
Engineering workRetaining walls / Earth retention systems / Structural design and coordination

Project record

Project overview

Discuss a similar site

Working for project architect HMC, Cefali & Associates designed a permanent shoring wall to relieve earth pressure from the proposed science building.

The temporary retained heights allowed for excavation of the new building's foundations, including drilled piles.

The architect's terraced hillside concept created several non-typical corner conditions. Cefali coordinated the wall design with building structural engineer Saiful Bouquet as the retaining geometry and foundation conditions were developed.

The project was reviewed and approved by DSA. The project was managed by Gafcon and the shoring was installed by Shoring Engineers.

Site conditions and engineering work

What shaped the design.

  • Permanent shoring wall for a hillside science building
  • Temporary retained heights supporting drilled-pile foundation excavation
  • DSA-reviewed education project with complex terraced corner conditions