The Burbank-Glendale-Pasadena Airport Authority initiated a new passenger terminal at Hollywood Burbank Airport called Elevate BUR, a replacement passenger terminal for the region.
Cefali & Associates worked as the design arm of Malcolm Drilling Company's design-build team for the parking structure.
The shored excavation for the one-level below-grade structure accommodated large foundations, over-excavation requirements, and the sequence of construction. Coordination included existing structures, proposed grades, new retaining walls, and many new utilities.
The project was delivered by a joint venture of Holder Construction, Charles Pankow Builders, and TEC Management. It required 3D coordination: Cefali & Associates used Revit to model the shoring and coordinated tieback clashes with utility trade partners in Navisworks.