Utility coordination
New utility routes can conflict with tiebacks just as existing services can. At Hollywood Burbank Airport, Cefali used the shoring model to coordinate those conflicts with utility trade partners.
Market
Shoring, underpinning, and specialty foundations for airport construction around existing facilities, buried utilities, and restricted work areas.
Discuss your projectEngineering for your project
Airport construction can require excavation beside terminals, pavement, utilities, and structures that must remain in place. The support design needs to fit the available work zones and coordinate with other construction packages.
Cefali & Associates designed shoring for the parking structure at Hollywood Burbank Airport and has provided excavation and foundation support across multiple LAX projects. The LAX portfolio includes terminal and bridge work, approach pits, underpinning, and micropiles.
Design and construction
New utility routes can conflict with tiebacks just as existing services can. At Hollywood Burbank Airport, Cefali used the shoring model to coordinate those conflicts with utility trade partners.
Access, overhead clearance, and nearby structures affect which equipment and support systems can be used at each location.
Shoring can adjoin work by several contractors, including foundations, retaining walls, bridges, and terminals. Drawings and construction stages must line up across those packages.
Our experience
Structural engineering support for aviation projects and related infrastructure conditions.
For the Hollywood Burbank Airport parking structure, Cefali modeled shoring in Revit and coordinated tieback and utility conflicts in Navisworks.
The LAX portfolio includes excavation support, interim column support, underpinning, building shoring, and micropiles across multiple projects.
Related services
Our services cover excavation support, retaining systems, and specialty foundations. The right combination depends on the ground conditions, existing structures, and work you are building.
Planning guides
Discuss your project
Send the plans and site information you already have. Include your schedule, known access limits, and the engineering work you need help with.
Send project information