
Intuit Dome
Inglewood, California: cross-lot braces at the entrance tunnel supported excavation where tieback agreements were unavailable. The braces were positioned above truck traffic to keep the construction route open.
A basement excavation beside a Salt Lake City building or street needs support before the permanent walls and slabs exist. Cefali & Associates designs temporary shoring around the cut, neighboring structures, and the access needed to build.
Our Utah office is in Highland. A Salt Lake City engagement can address a shoring concept, detailed structural drawings and calculations, or a changed excavation condition. The geotechnical investigation and permanent building design remain distinct scopes.
Excavation and construction
A brace that supports the cut can also pass through a future slab or obstruct the truck route. Ramps, cranes, and material handling can add loads at the shoring edge. The pile, anchor, or internal-brace layout therefore needs to fit the excavation sequence and the permanent foundation work.
Salt Lake City’s site-development checklist identifies temporary shoring wall plans where applicable. The support layout is a structural design for the proposed construction stages, rather than a substitute for the finished basement wall.
Excavation and construction
The Utah Geological Survey identifies susceptible soils, groundwater, and earthquake shaking as factors in liquefaction. A regional map does not determine the design at an individual basement site. Site-specific geotechnical investigation supplies the relevant ground and water criteria.
The shoring engineer uses the recommendations applicable to temporary support. Water control, ground improvement, and the permanent foundation strategy involve separate expertise and scopes. The excavation design needs compatible assumptions without implying that structural shoring alone resolves liquefaction or groundwater.
Comparable California projects
These documented projects show the engineering and construction conditions. Each example identifies its actual location.

Inglewood, California: cross-lot braces at the entrance tunnel supported excavation where tieback agreements were unavailable. The braces were positioned above truck traffic to keep the construction route open.

Los Angeles, California: shoring redesign for a five-level garage coordinated three tieback rows at a reentrant corner near Pico Station. Revit was used to lay out the cased tieback shafts.
Engineering scope
A concept for bidding, detailed drawings and calculations, and engineering for construction-stage changes can be separate assignments. The proposal identifies the services included. Geotechnical assessment, water-control design, property rights, and contractor installation remain distinct responsibilities.
See our shoring engineering services, temporary shoring design, soldier pile walls, tieback shoring, and soil nail walls.
Planning resources