A Palo Alto basement excavation needs structural support while the permanent walls and slabs are being built. If the ground investigation identifies groundwater, the wall and proposed water-control arrangement also need compatible assumptions. Cefali & Associates designs the earth shoring portion of that work.

Our Northern California office is in Pleasant Hill. Relevant California experience includes the tied-back soldier pile wall at Hoag Memorial Hospital in Newport Beach, where groundwater and property limits affected the design.

Excavation and construction

Groundwater control and the retaining wall

Palo Alto publishes separate construction-dewatering guidance and applications for exclusionary techniques and controlled groundwater pumping. The appropriate water-control approach is a project-specific assignment. Its pressure assumptions, equipment locations, and installation stages affect the structural support.

A soldier pile and lagging wall retains soil but is not inherently a water cutoff. Cefali uses the geotechnical recommendations applicable to the shoring; water-control design and discharge permissions remain distinct. The site investigation must establish the ground and water conditions rather than inferring them from a Peninsula location.

Palo Alto Public Works dewatering, grading, and street-work resources

Excavation and construction

The support footprint can cross the basement boundary

Palo Alto distinguishes street work from private structures placed under, on, or over city-controlled property. A tieback can extend beyond the basement even when the finished building stays inside the lot. Buried utilities and neighboring foundations can limit that outward path independently of the available permissions.

Internal rakers or cross-lot braces use space inside the excavation instead. Their foundations, elevations, and removal stages need to fit the permanent basement work. At Intuit Dome in Inglewood, Cefali placed cross-lot braces above the truck route when tieback agreements were unavailable.

Comparable California projects

Experience with constrained excavation.

These documented projects show the engineering and construction conditions. Each example identifies its actual location.

Hoag Memorial Hospital image 1
Hoag Hospital Newport Beach, 1 Hoag Dr., Newport Beach, CA 92663

Hoag Memorial Hospital

Newport Beach, California: permanent tied-back soldier pile wall design affected by groundwater, property limits, and an existing methane gas well.

Intuit Dome image 1
3930 W. Century Blvd., Inglewood, CA 90303

Intuit Dome

Inglewood, California: cross-lot braces above entrance-tunnel truck traffic where tieback agreements were unavailable.

Engineering scope

From a support concept to structural details.

A concept for bidding, detailed drawings and calculations, and engineering for construction-stage changes can be separate assignments. The proposal identifies the services included. Geotechnical assessment, water-control design, property rights, and contractor installation remain distinct responsibilities.

See our shoring engineering services, temporary shoring design, soldier pile walls, tieback shoring, and soil nail walls.

Northern California office

2800 Pleasant Hill Road, Suite 225
Pleasant Hill, CA 94523

View this office on Google Maps

Discuss your project

Show us the excavation you need to support.

Send the project location, preliminary plans, and any geotechnical information you already have. Describe nearby structures, access limits, or what changed during construction. You do not need a complete design package to begin a conversation.

Discuss the shoring scope