Deepening a Berkeley basement or adding below-grade space can remove soil beside foundations that still carry the building. Cefali & Associates designs temporary earth shoring around the cut and retained structures, with underpinning addressed as a distinct scope where needed.

Our Northern California office is in Pleasant Hill. Documented work at Westfield Century City in Los Angeles included bracing existing basement walls while new construction proceeded inside the retained perimeter.

Excavation and construction

Retained walls can lose restraint when slabs are removed

An existing basement wall may depend on the floor slabs for lateral restraint. Cutting out a slab or lowering the basement floor changes that support before the new structure exists. The temporary design has to follow the demolition and rebuilding stages.

At Westfield Century City, Cefali used strongbacks and tiebacks at retained walls while keeping clear of proposed decks. Existing wall strength, deep utilities, and a bridge pier affected the arrangement. A Berkeley alteration needs its own foundation records and structural assessment before assuming the same wall can serve through construction.

Excavation and construction

Support at a street or sewer connection

Berkeley identifies engineering permits for construction affecting city infrastructure, including sidewalks, streets, and sewers. A basement cut can remain on private property while its anchors, staging, or utility work interact with that infrastructure. The structural support layout and permission for public-space work address different needs.

A tieback path must account for the actual underground assets. Internal braces avoid extending support behind the wall but can cross a future slab or narrow the excavation route. Cefali designs the structural arrangement from the site-specific criteria and construction geometry, while public infrastructure review remains with the responsible authority.

Berkeley engineering permits for city infrastructure

Comparable California projects

Experience with constrained excavation.

These documented projects show the engineering and construction conditions. Each example identifies its actual location.

Westfield Century City image 1
10250 Santa Monica Blvd., Los Angeles, CA 90067

Westfield Century City

Los Angeles, California: strongbacks and tiebacks braced retained basement walls while accommodating new decks and deep utilities.

Engineering scope

From a support concept to structural details.

A concept for bidding, detailed drawings and calculations, and engineering for construction-stage changes can be separate assignments. The proposal identifies the services included. Geotechnical assessment, water-control design, property rights, and contractor installation remain distinct responsibilities.

See our shoring engineering services, temporary shoring design, soldier pile walls, tieback shoring, and soil nail walls.

Northern California office

2800 Pleasant Hill Road, Suite 225
Pleasant Hill, CA 94523

View this office on Google Maps

Discuss your project

Show us the excavation you need to support.

Send the project location, preliminary plans, and any geotechnical information you already have. Describe nearby structures, access limits, or what changed during construction. You do not need a complete design package to begin a conversation.

Discuss the shoring scope