Market

Transportation and Infrastructure Structural Engineering

Structural support for tunnels, shafts, and crossings beneath or beside streets, transit facilities, and other public infrastructure.

Discuss your project

Engineering for your project

Shoring for tunnels, shafts, and infrastructure work

Underground infrastructure work often takes place in narrow work zones near roads, transit facilities, and utilities that remain in service. Temporary support needs to fit the excavation and the access required for crews, equipment, and materials.

Cefali & Associates has designed support for the Metro 7th Street Station passage and temporary shoring for the Wallis Annenberg Wildlife Crossing. These projects involved different construction constraints, from excavation beneath an active street to support for bridge and earthwork stages.

Design and construction

What affects the shoring and foundations.

01

Roads, transit, and utilities

Roads, transit structures, and buried utilities can limit drilling locations, allowable movement, and the work area available for construction.

02

Confined construction

Low overhead clearance, limited equipment reach, and narrow work zones can affect installation methods and connection details.

03

Temporary and permanent construction

The support system needs to work at each excavation stage and leave room for the permanent tunnel, crossing, or utility structure.

Our experience

Related projects

Structural engineering for transportation and infrastructure projects involving tunnels, shafts, earth retention, and constrained access.

Metro BLOC Tunnel

For the Metro BLOC Tunnel, a system of beams and columns was installed as excavation advanced toward the station beneath an active roadway and public stairway.

Related services

Shoring and foundation engineering.

Our services cover excavation support, retaining systems, and specialty foundations. The right combination depends on the ground conditions, existing structures, and work you are building.

Discuss your project

Tell us what you are planning.

Send the plans and site information you already have. Include your schedule, known access limits, and the engineering work you need help with.

Send project information

Useful information to send

  • Alignment and excavation sections
  • Records for nearby public structures and utilities
  • Proposed construction sequence and access plan

Portfolio

Additional projects

01ANAHEIM CONVENTION CENTERTransportation Infrastructure

Project overview

Project photos from Cefali & Associates.

ANAHEIM CONVENTION CENTER image 2
ANAHEIM CONVENTION CENTER image 3
02COLORADO RIVER AQUEDUCT MICROPILES - Construction ServicesTransportation Infrastructure

Project overview

Project photos from Cefali & Associates.

COLORADO RIVER AQUEDUCT MICROPILES - Construction Services image 2
COLORADO RIVER AQUEDUCT MICROPILES - Construction Services image 3
COLORADO RIVER AQUEDUCT MICROPILES - Construction Services image 4
COLORADO RIVER AQUEDUCT MICROPILES - Construction Services image 5
COLORADO RIVER AQUEDUCT MICROPILES - Construction Services image 6
COLORADO RIVER AQUEDUCT MICROPILES - Construction Services image 7
COLORADO RIVER AQUEDUCT MICROPILES - Construction Services image 8
03EAST COUNTY DETENTION CENTERTransportation Infrastructure

Project overview

Project photos from Cefali & Associates.

EAST COUNTY DETENTION CENTER image 2
EAST COUNTY DETENTION CENTER image 3
04EL MORROW RESERVOIRTransportation Infrastructure

Project overview

Project photos from Cefali & Associates.

EL MORROW RESERVOIR image 2
EL MORROW RESERVOIR image 3
EL MORROW RESERVOIR image 4
05FORT MOORETransportation Infrastructure

Project overview

Project photos from Cefali & Associates.

FORT MOORE image 2
FORT MOORE image 3
FORT MOORE image 4
FORT MOORE image 5
06SILVERLAKE PHASE IIITransportation Infrastructure

Project overview

Project photos from Cefali & Associates.

SILVERLAKE PHASE III image 2
SILVERLAKE PHASE III image 3
SILVERLAKE PHASE III image 4
07TOYON TANKSTransportation Infrastructure

Project overview

Project photos from Cefali & Associates.

TOYON TANKS image 2
TOYON TANKS image 3
TOYON TANKS image 4
TOYON TANKS image 5
TOYON TANKS image 6
08WALLIS ANNENBERG WILDLIFE CROSSINGTransportation Infrastructure

Project overview

WALLIS ANNENBERG WILDLIFE CROSSING The National Park Service researched transportation infrastructure's effect on wildlife habitat. The 101 Freeway creates a barrier that isolates animal populations within the Santa Monica Mountains. The Wallis Annenberg Wildlife Crossing was developed to restore habitat connectivity across the ten-lane freeway and an adjacent access road at a location where protected lands exist on both sides of the corridor. Images of mountain lions as potential crossers adorn the project website promoting the completion of the crossing. Our firm provided engineering services related to temporary earth shoring design at the base of the site during early construction phases that allowed the bridge and abutments to be constructed ahead of the southerly earthwork. Our services were performed for the General Contractor, C.A. Rasmussen, and the shoring was installed by Malcolm Drilling. The shoring design used Caltrans available beam supply and allowed height to be added to the top of the shoring as grading operations backfilled a slope up to the abutment level.

WALLIS ANNENBERG WILDLIFE CROSSING image 2
WALLIS ANNENBERG WILDLIFE CROSSING image 3
WALLIS ANNENBERG WILDLIFE CROSSING image 4
WALLIS ANNENBERG WILDLIFE CROSSING image 5