Most of the shoring at Intuit Dome in Inglewood used cantilever and tieback-braced soldier piles. Cefali & Associates worked with Malcolm Drilling on the temporary and permanent shoring for an arena whose court sits more than 30 feet below existing grade.
A soldier pile layout has to carry excavation loads while leaving room for installation and the structure being built. Piles may act as cantilevers along one part of a site and need anchors or internal braces elsewhere, depending on the retained height, loads, and available space.